O B J E C T / O F F E R No. 707099
|
|
|
ONE CENTAUR 50 GAS TURBINE
GENERATOR PACKAGE
ORIGINAL DATE OF MANUFACTURER 1997.
21,867 FIRED HOURS FROM NEW
1.
GAS TURBINE
- Centaur 50
(T5701) Gas Turbine. Nominal 4.0 MW.
-
Speed reducing gearbox.
- Flexible shear
coupling.
- Vibration
monitoring system (two channel - turbine and gearbox).
GAS TURBINE AUXILIARY SYSTEMS
2.
GAS FUEL SYSTEM
- Pressure monitor.
- Primary and
secondary shut off valves.
- Fuel control
valve.
- Fuel control
actuator.
- Polishing filter
unit.
3.
LUBRICATION SYSTEM
- Main pump
mechanically driven from gas turbine gearbox.
- AC motor driven
pre/post pump.
- Duplex oil
filter.
- Oil tank in skid
base.
- Pressure and
temperature controllers.
- Oil coalescer
(supplied loose).
4.
ELECTRO-HYDRAULIC START SYSTEM
- Hydraulic start
motor (gearbox mounted).
- Hydraulic pump
(AC motor driven).
- Oil tank.
5.
COLD CRANK WATER WASH SYSTEM
- Cold crank water
wash manifold
- Water wash
trolley supplied loose incorporating:
6.
AC GENERATOR (LEROY SOMER)
- Horizontal, 2
sleeve bearing, 4 pole.
- Salient pole
brushless.
- Open air circuit.
- Enclosure IP21.
- Temperature rise
F.
- Insulation Class
F.
- Supply
3.3KV/3-phase/3 wire/50 Hz.
-
Continuous rating matched to gas turbine (total temperature basis) at 0.8pf
across specified ambient range.
-
Automatic voltage regulator including parallel operation CT's quad droop
assembly, three phase sensing, power factor control and manual operation.
(AVR etc. mounted in control panel).
- CT's 3 off for
protection.
- CT's 3 off for
Dale instrumentation…
- VT between star
point and earth for protection relays.
- Stator winding
temperature monitoring (2 RTD's per phase).
- Drive end and
non-drive end bearing temperature detection.
- Drive end and
non-drive end bearing seismic vibration monitors.
- Anti condensation
heaters.
OFF SKID CONTROL AND ELECTRICAL EQUIPMENT
7.
TURBINE CONTROL PANEL
- Gas
turbine/auxiliary systems/governor/load/T5 sequence controller
(Mitsubishi PLC).
- Visual display
unit system interface.
- Turbine and
alternator vibration monitoring equipment.
- T5 temperature
indicator.
- Turbine speed
indicator.
- Turbine hours run
indicator.
- Turbine start
counter.
- Hard wire PLC
backup logic where required.
-
Miscellaneous push buttons, switches and indicators as required by Dale Control
System.
- Miniature moulded
case circuit breakers for circuit protection.
- Panel anti
condensation heater and thermostat.
-
Additional panel mounted hardware including PLC computer serial interface
module to enable remote monitoring and external systems interface.
- Panel ventilation
fan.
- Panel interior
light.
- PC power supply
socket.
8.
ALTERNATOR CONTROL PANEL
-
Key pad operated electronic metering unit (V, Hz, A, kW, kWh, kVAR and PF).
- Bus/Mains and
generator zero voltmeter.
- Bus/Mains and
generator dual scale frequency meter.
- Synchroscope.
- Automatic
synchronising equipment including check sync relay.
- Miscellaneous
push buttons, switches and indicators.
- Miniature moulded
case circuit breakers for circuit protection.
- Panel
anti-condensation heater and thermostat.
-
Loose items supplied with the alternator, for example the AVR, are also mounted
in the control panel.
- Panel ventilation
fan.
- Panel interior
light.
9.
AUXILIARY SYSTEMS PANEL
- DC backup battery
and charger.
- DC voltmeter and
under voltage detection.
- Panel
anti-condensation heater and thermostat.
- Panel ventilation
fan.
- Panel interior
light.
10. DOCUMENTATION
2 copies of the following supplied:
- Dale instruction
manual.
- Full set of
operation and maintenance manuals.
- Manufacturing
programme.
- Drawings:
- General
arrangement.
- Foundation
loading.
- Electrical
schematics
- Liquid
schematics.
- Fuel schematics.
11. MISCELLANEOUS
- First fill of
lubricating and hydraulic oil.
- Static test at
Dale works.
- First years
supply of consumables
- Outdoor
Enclosure.
- GT combustion air
intake filters, ductwork and attenuation.
- Enclosure ventilation fan.
- Fire and gas
detection/fire fighting equipment.
- Enclosure
ventilation inlet and outlet filters, ductwork and attenuation
- Power
Transformer.
13. SALES
OPTIONS
- 5 Year extended
warranty and maintenance contract.
-
Installation &
Commissioning. - € Euros 50,000.00 except Iraq
Customer to provide engineer(s) with
good quality single accommodation, food and transport upon arrival at works, at
no cost to Contractor.
-
Dual Fuel
Conversion.
-
60 Hz Conversion.
-
Refurbished to Zero
Hours. - € Euros 1,300,000.00 FOB European Port
Warranty will be 12
month from Installation or
5000 running hours,
whichever is soonest.
-
Upgraded Controls
System.
-
As is where is. –
United Kingdom
-
Delivered.
14.
SALES PRICE
-
As is where is. – Europe € 385,000,--
-
All transport and shipping costs at buyers charge
Pictures:
attached, more pictures on request.
Viewing:
to be agreed with us.
Remarks:
1.) installation and putting into operation on request.
2.) the plant is in excellent condition and finally inspected
by the AXA in April 2007.
